Way back in October of 2009( I think) Brad's birthday present to me was " A NEW SHOWER". October of 2011 we finally started on it. It has been so long, I cannot find my "before" picture.
First we took out the ugly green tile, carpet and the toilet. I was without a toilet for about a month, but I could still use the shower.I decided that I wanted to change the cabinets, so I refinished them myself.
He tiled the floor and added a needed step for getting into the garden tub. Then came the majority of the demolition.
Everyone helped. The shower was so dark, and it was too difficult to run any lighting in there, so we decided to put a glass block window in the shower to add some light.
All hands were helping hands.
Brad took out the ceiling and the plumbing wall. Insulation was EVERYWHERE!
This is the glass block window.
After all of the demo and prep work, we could finally get started on the shower. Brad had done the surround for the tub before most of the shower demo.
This is the shower most of the way finished. He added a seat and a niche for shampoo.
Here is the tub mostly finished. Brad wanted to have the entire bathroom finished before our anniversary trip to Hawaii, but when he injured his back (because of the tiling) the bathroom wasn't complete until the middle of May.
New curtains, lighting, plumbing fixtures, door nobs, linens, decor, sink, countertop, etc.. And one happy wife! So glad that it is finally done and so proud of Brad and his attention to detail and his talents. Someday we might even purchase the $200 new faucet for the tub, but for now, we are "happy as pie"!